Piling & Foundation
Company in the UAE

Geotechnical Excellence, Built on Trust

From bored piles to ground improvement, Soiltec delivers comprehensive geotechnical solutions across all seven Emirates — backed by 20+ years of proven expertise.

0
Projects Completed
0
Team Members
0
Years of Experience
0
Equipment Units
0
Clients Served
0
Emirates Covered
About Soiltec

Building the UAE's Foundations Since 2006

Soiltec Piling & Foundation LLC was established in 2006 in Dubai, UAE, as a specialized geotechnical engineering contractor. From day one, our mission has been to deliver safe, high-quality foundation solutions. Before driving the first pile, our typical workflow involves rigorous soil investigation and analysis of the soil strata to accurately determine the optimal load bearing capacity for your structures.

Whether navigating complex deep excavation challenges in dense urban environments or implementing precise foundation design, we manage the entire life cycle of the substructure. Our expertise extends to securing stable anchors into solid bedrock and validating structural performance through rigorous pile load test procedures on all bearing piles.

Today, with over 700 completed projects and a workforce of 251+ professionals, Soiltec has earned a reputation as one of the region's most trusted foundation contractors — serving clients from Abu Dhabi to Ras Al Khaimah.

Learn More About Us

Safety First

Strict HSE protocols on every project site

Technical Excellence

International codes and cutting-edge software

Client Focus

Customized, cost-effective solutions

Modern Fleet

77 equipment units ready for deployment

Our Portfolio

Featured Projects

A selection of landmark projects showcasing our expertise in piling, shoring, and ground improvement.

Piling Foundation for Etihad Rail Network project in Jabal Ali, Dubai — Bored Piles of 2.0 m Diameter, 47.0 m Depth
Infrastructure Ongoing

Etihad Rail Network

Jabal Ali, Dubai
Client Etihad Rail
Contractor NPC (National Projects & Construction Co.)
Scope Piling Foundation
Key Highlight

Bored Piles of 2.0 m Diameter, 47.0 m Depth

Piling Foundation for The Chedi Tower (G+5P+3Ser+44Typ) project in Al Thanyah 1, Dubai — 2.0 m Diameter Bored Piles, Working Load 3,500 kN
Commercial Ongoing

The Chedi Tower (G+5P+3Ser+44Typ)

Al Thanyah 1, Dubai
Client Al Seeb Properties
Contractor Soiltec Piling & Foundation
Scope Piling Foundation
Key Highlight

2.0 m Diameter Bored Piles, Working Load 3,500 kN

Soil Improvement & Cavity Filling for Baalghaiylam Development project in Al Bahyah, Abu Dhabi — 92,000 LM of Drilling & Grouting
Residential Ongoing

Baalghaiylam Development

Al Bahyah, Abu Dhabi
Client Aldar
Contractor Trojan General Contracting
Scope Soil Improvement & Cavity Filling
Key Highlight

92,000 LM of Drilling & Grouting

Shoring & Piling Foundations for Cove Living Residence (2B+G+3P+MECH+30+RF) project in Wadi Al Safa 5, Dubai — 13,200 LM of Bored Piles Executed
Residential Completed

Cove Living Residence (2B+G+3P+MECH+30+RF)

Wadi Al Safa 5, Dubai
Client Imtiaz Developments
Contractor Venco Imtiaz Contracting Co.
Scope Shoring & Piling Foundations
Key Highlight

13,200 LM of Bored Piles Executed

Piling Foundation for Muna British Academy — Saadiyat Lagoon project in Al Saadiyat Island, Abu Dhabi — 873 Bored Piles Executed in 42 Days
Institutional Completed

Muna British Academy — Saadiyat Lagoon

Al Saadiyat Island, Abu Dhabi
Client Aldar Education
Contractor Chicago Maintenance & Construction Co.
Scope Piling Foundation
Key Highlight

873 Bored Piles Executed in 42 Days

Piling Foundation for Sheikh Mohamed Bin Zayed Central Hospital project in Ajman — 1,700 Bored Piles
Institutional Ongoing

Sheikh Mohamed Bin Zayed Central Hospital

Ajman
Client Presidential Court
Contractor SML Abu Dhabi Engineering & Contracting
Scope Piling Foundation
Key Highlight

1,700 Bored Piles

Trusted Partners

Key Clients

Selected developers, authorities, and utilities we have supported across the UAE.

IMTIAZ

Department of Municipalities and Transport

Dubai Electricity & Water Authority

TAQA

Trusted By

Our Clients & Partners

Trusted by leading developers, government entities, and international engineering firms across the UAE.

Aldar Properties
Trojan General Contracting
Venco Imtiaz Contracting
ADNOC
DEWA
Dubai Airports
Nakheel
Etisalat
Government of Dubai
TAQA
Hitachi Energy
Petrofac
Parsons
Atkins
AG Engineering
Al Naboodah
SEPCOIII
Prestige One
Samana
Taweelah
FAQ

Common Questions About Piling in the UAE

Answers to frequently asked questions about geotechnical contracting, piling services, and working with Soiltec.

What does a piling contractor do?

A piling contractor installs deep foundation elements — such as bored piles, CFA piles, and driven piles — that transfer structural loads from buildings and infrastructure to stable soil or rock layers below ground. In the UAE, piling is essential because most construction sits on sandy or weak soils that cannot support heavy structures without deep foundations.

Why is Soiltec trusted for piling in Dubai and Abu Dhabi?

Soiltec has been operating in the UAE since 2006 and has completed over 700 geotechnical projects across all seven Emirates. Our team of 251+ professionals and fleet of 77 specialized equipment units allow rapid mobilization to any project site, while our engineers bring 20+ years of regional experience with international methodologies.

What geotechnical services does Soiltec provide?

Soiltec offers four core service categories: piling systems (bored piles, CFA piles, micro-piles), retaining and shoring systems (secant piles, contiguous piles, sheet piles), ground improvement (stone columns, vibro compaction, grouting), and enabling works (excavation, dewatering, soil nailing).

How deep can Soiltec install bored piles?

Soiltec installs bored piles up to 2.0 m in diameter and exceeding 47 m in depth, depending on soil conditions and structural requirements. Our rotary drilling rigs are equipped with temporary casing and polymer stabilization systems for challenging ground conditions.